The work needed–
–
– over what the work needed

Starts with a sample entry. Nothing you type leaves this page.

How the sum works

Cement needed is the volume poured multiplied by the cement content of your approved mix design.

The excess is what was issued minus what was needed. If the excess is more than your allowed wastage, the pour is flagged.

The cement content differs by grade and mix, so use the figure from your own mix design.

This is one site, one day

ERP Infra does the same sum for every site and every material, every day, from what the site already enters.

Book a free demo

Questions people ask

How do I calculate cement consumption for a concrete pour?
Multiply the volume poured in cubic metres by the cement content of the mix in bags per cubic metre. For 120 m³ at 6.5 bags per m³, that is 780 bags.
How much cement wastage is normal?
It varies by firm and site conditions. Set an allowance you are prepared to accept, then look at every pour that exceeds it.

Let’s put every site on one screen.

Tell us how many projects and sites you run. We will walk you through the system on a call and suggest where a pilot would pay back first.

Book a free demo on WhatsApp
Phone and WhatsApp: +91 92569 97690 Email: flip.retail1@gmail.com B-2, B203 Brij Villa, Rajendra Marg, Bapu Nagar, Jaipur 302015, India