Cement leakage calculator
How many bags did your last pour lose? Enter the volume poured, the cement content of your mix and what the store issued.
How the sum works
Cement needed is the volume poured multiplied by the cement content of your approved mix design.
The excess is what was issued minus what was needed. If the excess is more than your allowed wastage, the pour is flagged.
The cement content differs by grade and mix, so use the figure from your own mix design.
This is one site, one day
ERP Infra does the same sum for every site and every material, every day, from what the site already enters.
Book a free demoQuestions people ask
- How do I calculate cement consumption for a concrete pour?
- Multiply the volume poured in cubic metres by the cement content of the mix in bags per cubic metre. For 120 m³ at 6.5 bags per m³, that is 780 bags.
- How much cement wastage is normal?
- It varies by firm and site conditions. Set an allowance you are prepared to accept, then look at every pour that exceeds it.
Related
Material leakage
Material goes missing between the store, the site and the work.
GlossaryCement consumption per cubic metre
How much cement is needed per cubic metre of concrete?
CalculatorSteel wastage calculator
Compare the weight of steel in your bar bending schedule with what the store issued for the same work.
CalculatorDiesel consumption calculator
Check one machine for one day or one week: hours worked from the hour meter, its normal burn, and the diesel issued to it.
Let’s put every site on one screen.
Tell us how many projects and sites you run. We will walk you through the system on a call and suggest where a pilot would pay back first.