Construction ERP software for contractors in Surat
ERP Infra tracks purchase, stock, labour, machinery and cost on every site, and flags what does not add up the same day. Below is what is being built in Surat and where projects there tend to lose money.
Construction in Surat, in brief
-
Surat Metro Phase 1 is a 41.93 km, two-line network with 37 stations at an estimated ₹12,020 crore, under construction with none of it open as of September 2025 and completion expected in 2027.
Source: The Metro Rail Guy, September 2025 -
Surat Metro construction began on 18 January 2021, and the first section deadlines of December 2024 and March 2025 set in 2023 were later missed.
Source: Metro Rail Today, August 2023, and The Metro Rail Guy, September 2025 -
Gujarat had 16,265 projects registered with its RERA between 2017 and 2024, about 14 percent of the national total.
Source: The Realty Today citing PropEquity, March 2025
The work that dominates
- elevated and underground metro
- residential projects registered with GujRERA
Where Surat projects tend to lose money
Budget, committed and actual, per site, every day.
Metro deadlines moved from 2024-25 to 2027, lengthening contract periods.
How it worksThe daily report writes itself, the same evening.
Two lines with elevated and underground sections need section-wise progress tracking.
How it worksIssued against needed. The excess is flagged.
Viaduct and station concrete and steel quantities are large enough that small losses add up.
How it worksFigures in the screens above are sample data.
Terms used on Surat sites
The words differ from place to place; the records behind them are the same.
- SMC
- Surat Municipal Corporation
- SUDA
- Surat Urban Development Authority
- GujRERA
- Gujarat Real Estate Regulatory Authority
- brass
- 100 cubic feet, used for sand and aggregate in Gujarat
Questions from Surat
- Can contractors in Surat use ERP Infra?
- Yes. ERP Infra is web-based: office staff use it in a browser and site staff in a phone browser, so it can be used on projects in Surat. Demos and onboarding are done online by the Flip Retail team.
- Does ERP Infra have an office in Surat?
- No. ERP Infra is made by Flip Retail, based in Jaipur, India. Work with companies in Surat is done remotely, starting with a one-month pilot on one project.
- What should a construction company in Surat check before choosing an ERP?
- Check that it is organised by project and site, that site staff can use it on a phone, and that it can show the same evening what a site cost and whether material used matched the work done. Then ask for a pilot on one of your own projects before committing.